最新国产成人极品美女高潮福利_日韩精品免费九色伊人_在线人妻系列无码专区_好黄好污美女裸体网站_尤物在线点击一区_国产清纯校花呻吟在线观看_亚洲日本在线观看一区二区_国产1024成人精品视频_综合亚洲伊人午夜_久久精品2019www中文

Hotline:139-2949-6629
  • Company News|
  • Industry news|
  • location:Home > > Industry news
    Industry news

    Installation requirements of fine carving machine guide rail

    Date:2018-10-17 Click:3738

    The reference guides are respectively located: Y axis reference guides are on the left side of the base, X axis reference guides are on the front of the beam and Z axis reference guides are on the left side of the hanging plate.



    The guide base plane is located at: the guide base plane of Y axis X axis is the shoulder plane, while the one side in the groove and the Z axis is the outer side.



    Guide orientation and fixation: the direction of the arrow is marked on the guide rail, indicating the reference surface, that is, the side of the arrow should be installed close to the reference surface.



    Fixing screws for guide: screw M5*20(400, 600T), screw M6*25(cutterhead machine), all of which are slightly locked before adjusting and correcting during each assembly period (short guide is locked from one end to the other, and long guide is locked from the middle to both sides in turn).